B1911UYG-20D-002914 Optoelectronic Products 571nm LED Indication Discrete 2.1V 0603

Place of Origin Taiwan
Brand Name Harvatek Corporation
Certification RoHS
Model Number B1911UYG-20D-002914
Minimum Order Quantity 3000
Price negotiate
Packaging Details Cut Tape (CT)
Delivery Time 5-8 work days
Payment Terms T/T
Supply Ability 6000

Contact me for free samples and coupons.

Whatsapp:0086 18588475571

Wechat: 0086 18588475571

Skype: sales10@aixton.com

If you have any concern, we provide 24-hour online help.

x
Product Details
Model B1911UYG-20D-002914 Millicandela Rating 45mcd
Voltage - Forward (Vf) (Typ) 2.1V Current - Test 20mA
Color Yellow-Green Package / Case 0603 (1608 Metric)
Product Status Active Operating Temperature -40°C ~ 85°C
Mounting Type Surface Mount Applications Automotive
High Light

B1911UYG-20D-002914 571nm LED Indication Discrete

,

Optoelectronic Products 571nm

,

Optoelectronic Products LED Indication Discrete 2.1V 0603

Leave a Message
Product Description

B1911UYG-20D-002914 Yellow-Green 571nm LED Indication - Discrete 2.1V 0603

specification of B1911UYG-20D-002914

Mfr
Harvatek Corporation
Product Status
Active
Color
Yellow-Green
Lens Transparency
Diffused
Millicandela Rating
45mcd
Lens Style
Rectangle with Flat Top
Lens Size
1.00mm x 0.80mm
Voltage - Forward (Vf) (Typ)
2.1V
Current - Test
20mA
Viewing Angle
125°, 128°
Mounting Type
Surface Mount
Wavelength - Dominant
571nm
Wavelength - Peak
573nm
Package / Case
0603 (1608 Metric)
Supplier Device Package
0603
Size / Dimension
1.60mm L x 0.80mm W
Height (Max)
0.70mm

 

B1911UYG-20D-002914 Optoelectronic Products 571nm LED Indication Discrete 2.1V 0603 0

ORIGINAL

 

Our company ensures that each batch of products comes from the original factory, and can provide original labels and professional testing agency reports.

 

PRICE

 

We provide a variety of quotation channels, and sign the order contract after negotiation.

 

TRANSACTION

 

After communication and agreement, we will guide you to arrange payment.

 

DELIVERY CYCLE

 

Delivery on the same day, generally 5-12 working days, may be slightly delayed during the epidemic, we will follow up the whole process.

 

TRANSPORT

 

We will choose the appropriate transportation mode according to your country.

 

PACKAGING

 

After communication with you, we will choose the appropriate packaging method according to the weight of the goods to ensure the safe delivery of the goods.